CASE STUDY: ATTWOOD HOUSE OFFICE DILAPIDATIONS
OFFICE DILAPIDATIONS – WORCESTER
With limited timescales and critical deadlines, our client instructed the dilapidation works ahead of vacating the premises. Within 2-weeks on site our team completed the strip out of office space, which included partition, door, floor finishes, pet ceiling and data removal with modifications / isolation and removal of mechanical and electrical services.
Retaining the existing lighting and small power installations, the layouts were modified to suit the open plan Cat-A layout. Suspended lay-in grid ceilings made good with tiles replaced.
Full decoration throughout transformed the space, completed with new commercial carpet tiles and a deep clean leaving the circa 900m2 office space ready for occupation by the next tenant.