CASE STUDY: SCHOOL AT CHIPPING NORTON
SCHOOL CONVERSION – CHIPPING NORTON
Conversion of former classroom, staff room and storage area into a large modern multi-use area, with teapoint, direct link to kitchen with new kitchen office. Works completed within a 6-week duration, initially with strip out of ceilings, partitions, teapoint, floor coverings, asbestos and ff&e. The new air-conditioning system and lighting installations allows for the area to be split into 3 x areas, providing control and flexibility to the space. Acoustic specifications rated highly on the client brief, with the introduction of Ecophon GedinaE ceiling tiles, Forbo Eternal vinyl floors and bespoke acoustic wall panels, the area is fit for any use. The high-quality American black walnut doors complimented the clients colour scheme, finished with addition of black out blinds. The kitchen area is now directly accessible having formed a structural opening into the main kitchen, in the process forming a new kitchen office. (whilst the kitchen was operational!
Testimonial:
“Thanks for all your efforts on this one, you’ve made it look easy and it’s been a pleasure to work with you and the Studio Fourteen crew!”